Nevada State Profile

Last Updated: 9/15/26 — Updated Monthly

STATE OF PLAY

Nevada leads the nation in solar power potential, and its clean energy industry employs over 36,000 workers in the state, an increase of over 16% since 2020. Nevada is also home to 91 planned or operating data centers, and planned data centers would require the state to expand its power sector by 40%. Despite Nevada’s strong clean energy economy, Trump and Republicans have threatened 450 clean energy jobs and the loss of 4.2 GW of new energy generation in the state needed to meet rising demand. 

KEY 2026 RACES
NV-GOV

ENERGY BREAKDOWN

CLEAN ENERGY PROJECTS & JOBS

Clean Energy Projects Announced Since IRA Passage
Project SummaryProjected Jobs InvestmentProject Status
ABTC Cathode Grade Lithium Hydroxide ProjectIn October 2022, American Battery Technology Company (ABTC) received a $57 million BIL grant for its Tonopah Flats Lithium Hydroxide project. In April 2024, ABTC announced it was selected for a $20 million award through the Qualifying Advanced Energy Project Credits program, which was expanded through the IRA through the DOE. 150$983 millionOperational
Aqua Metals Battery Materials Tahoe-Reno Recycling CampusIn January 2023, Aqua Metals announced it would open a lithium-ion battery recycling campus in Reno, celebrating the IRA’s support for the battery industry. ––Announced
Aqua Metals Storey County Battery Recycling ExpansionIn January 2024, Aqua Metals announced a $17 million expansion at its Storey County battery recycling facility. In August 2023, Aqua Metals released a press release on the benefits of the IRA for EV recycling. 50$17 millionUnder Construction
Bonnie Claire Lithium ProjectIn September 2023, Nevada Lithium started its 2023 drill program at its Bonnie Claire lithium project in Nye County. The drill program supports the feasibility study for the Bonnie Claire lithium project. –$547 millionOperational
Clairity Carbon Capture FacilityIn October 2024, Clairity Technology announced it would open a commercial carbon dioxide removal site in Southern Nevada. The site would remove 2,500 tons of carbon dioxide from the air annually and generate over 1,000 liters of potable water every day. 55$2.5 millionAnnounced
Edgewood Renewables Sustainable Aviation Fuel FacilityIn January 2024, Edgewood Renewables announced it would invest approximately $96 million in a new North Las Vegas sustainable aviation fuel facility that was expected to save around 987 million kilograms of CO2e emissions from being emitted annually. 70$96 millionAnnounced
Graphjet Technology Graphite Production FacilityIn April 2024, Graphjet Technology announced it would build an artificial graphite production facility in Nevada. Graphite is a key input for EV batteries and Graphjet’s planned facility would produce enough graphite per year to power more than 100,000 EVs. Graphite uses palm kernel material, a waste product, to produce graphite, lowering the environmental impact. 500$200 millionAnnounced
Greenlink Nevada TransmissionIn May 2023, the DOI advanced the permitting process for the Greenlink West transmission line, which would provide additional capacity for renewable energy in Clark, Esmerelda, Lyon, Mineral, Nye, and Storey counties. The project is projected to generate over $690 million in economic benefits for neighboring communities. In February 2025, NV Energy said Greenlink’s costs were expected to further increase as a result of Trump’s tariffs on Mexico as the company had executed long-term procurement contracts to import materials from Mexico. 4,000$2.5 billionPassed Regulatory Hurdle
Lilac Solutions Lithium Manufacturing FacilityIn October 2022, Lilac Solutions received a $50 million BIL grant to produce lithium using its IX lithium extraction technology. 250$129.3 millionPassed Funding Hurdle
Lyten Lithium-Sulfur Batteries GigafactoryIn October 2024, Lyten announced that it would open the world’s first lithium-sulfur battery gigafactory in Reno. Lyten produces lithium-sulfur battery cells that can store more energy and weigh less than lithium-ion and lithium iron phosphate batteries. All batteries produced at Lyten’s new manufacturing facility will be made in the U.S. with domestically sourced materials, qualifying for the IRA’s tax credits. 1,000$1 billionAnnounced
Nevada Gigafactory ExpansionIn October 2022, trade publications first reported Tesla was planning an expansion of its Nevada gigafactory. In January 2023, Tesla formally announced the expansion, backed by a $3.6 billion investment to add a 100 GWh cell factory and the first semi-factory to the facility. 6,500$3.6 billionUnder Construction
Nextracker and Unimacts Sloan Manufacturing FacilityIn January 2024, Unimacts announced it would open a new manufacturing facility in Sloan to produce components for solar farms. The new facility, a joint venture with Nextracker, produced torque tubes that held solar panels and allowed them to rotate. The new factory was expected to triple Unimacts’ manufacturing capacity for solar tubes manufacturing. Congresswoman Susie Lee credited the IRA’s incentives for domestic manufacturing as a reason for Unimacts’ expansion, a sentiment that was echoed by the company’s CEO, who said that the law provided the confidence the company needed to invest in U.S. manufacturing. 200–Operational
Nextracker Las Vegas Manufacturing FacilityIn September 2023, Nextracker announced the grand opening of its manufacturing facility in Las Vegas. The facility will produce critical steel components used in ground-mount solar power generation plants. Nextracker said that the IRA helped the company’s growth. 200–Operational
Octillion Power Systems Battery Manufacturing FacilityIn January 2025, Octillion Power Systems opened Nevada One, a battery manufacturing facility located in Reno. Octillion manufactured batteries for the EV, off-highway, commercial equipment, marine, and storage markets. 50–Operational
Rechargeable Power Safe Battery Service CenterIn July 2023, Rechargeable Power announced it would expand its Clark County lithium battery service center and establish a Safe Battery Service Center in the state. 88–Announced
Redwood Materials McCarran CampusIn February 2023, the DOE announced a $2 billion loan commitment to Redwood Materials to build and expand a battery materials campus in McCarran. However, the conditional loan commitment was unfinalized and could easily be canceled by the Trump administration. Redwood Materials discontinued its loan agreement in April 2025, but remained committed to the facility. 5,000$3.5 billionOperational
Rhyolite Ridge Lithium-Boron ProjectFirst announced in December 2018, the Rhyolite Ridge Lithium-Boron project to mine and process lithium carbonate for EV (EV) batteries was estimated to create 500 jobs in Nevada’s Esmeralda County. In December 2022, the project advanced into the final stages of the permitting process and, thanks to the BIL, secured a conditional commitment for a $700 million loan from the DOE in January 2023. More recent projections place the number of jobs created by the project at 500 construction jobs and 350 permanent operations jobs. On January 17, 2025, Ioneer announced it had finalized its loan commitment with the DOE Loan Programs Office for a $996 million loan, a $268 million increase from the conditional loan commitment. 850–Passed Regulatory Hurdle
SolarLink Panel FactoryIn January 2024, SolarLink announced plans to open a 2 GW solar panel factory in North Las Vegas. 150–Announced
Thacker Pass MineIn January 2023, GM announced a $650 million equity investment in Lithium America to support the development of the Thacker Pass Lithium Mine. In March 2024, Lithium Americas announced it received a $2.26 billion conditional loan guarantee from the DOE’s Loan Programs Office to support the construction of the project and closed the loan agreement in October 2024. 2,160$2.9 billionUnder Construction
Unimacts Solar Manufacturing ExpansionIn August 2023, Unimacts announced it had hired 80 new employees at its Las Vegas manufacturing facility for metal torque tubes, which allow solar panels to rotate during the day. Unimacts’ CEO said the company would not have the capacity to hire new staff without the IRA. 80–Announced
Urban Mobility Systems Heavy Duty Battery Electric Drive Trains Manufacturing FacilityIn June 2024, Urban Mobility Systems announced it would open a manufacturing and development center in Nevada. Urban Mobility Systems develops battery electric fuel cells and drive trains for heavy-duty on- and off-road vehicles. 350–Announced

Additional projects threatened or canceled in the state due to threats to clean energy:

Additional Threatened Or Canceled Clean Energy Projects
Project SummaryProjected Jobs InvestmentProject Status
Nevada Gold Mines Solar Grant CanceledIn May 2025, the DOE canceled a $95 million grant to Nevada Gold Mines. Nevada Gold Mines had planned to use the funding to build solar and battery energy storage facilities near its mining operations in Humboldt and Lander Counties, reducing emissions from onsite fossil-fuel generation. The project was expected to lower carbon emissions by 2 million tons over its lifetime. Construction of the solar and battery storage systems was expected to support 300 full-time jobs.300$95 millionGrant Cancellation
American Battery Technology Company Battery-Grade Lithium Hydroxide Manufacturing Grant CanceledIn October 2025, American Battery Technology Company’s grant to develop a battery-grade lithium hydroxide manufacturing facility was canceled. The $57.7 million grant, combined with $57.7 million in non-federal funding, was expected to support the construction, commissioning, and operation of a large-scale demonstration manufacturing facility using unconventional domestic sedimentary lithium sources. The facility was located in Tonopah.150$115.4 millionGrant Cancellation

Other projects in the state, started before the Inflation Reduction Act:

Project or Company NameProject DetailsProject Status
Atlas Molded ProductsAtlas’s Reno factory manufactures expanded polystyrene (EPS) insulation. Operational
Dicalite Management Group, Inc.Dicalite Management Group’s Fallon facility produces expanded perlite. Operational
Johns ManvilleJohns Manville’s Fernley facility manufactures roofing underlayments. Operational
Environmentally Safe Products, Inc.ESP, which manufactures insulation products, has a distribution center in Carson City. Operational
MicroMetl CorporationMicroMetl’s Sparks facility manufactures accessories for commercial heating and cooling equipment. Operational
Nanotech Energy Reno CampusIn November 2021. Nanotech announced it would expand its battery manufacturing operations to a 517-acre facility in Sparks. The facility was expected to support more than 1,000 jobs over the next five years. Announced
Havelock Wool LLCIn January 2014, Havelock Wool LLC, which manufactures wool-based insulation materials, announced plans to open a facility in Reno that was expected to employ 15-20 people. Operating
Thybar CorporationThybar Corporation, which manufactures roof curbs and accessories, has a manufacturing facility in Sparks. Operating
Rmax Operating, LLCRmax Operating, LLC manufactures insulation products from its facility in Fernley. Operating
Albemarle – Silver Peak MineAlbemarle’s Silver Peak Mine is the only active lithium resource in the United States and employs around 60 people. Operating
Big Rig ManufacturingBig Rig Manufacturing’s Las Vegas facility manufactures electric commercial vehicles.Announced
NuroNuro’s North Las Vegas facility manufactures autonomous electric vehicles. Announced
Lithion BatteryLithion Battery opened its second facility in Hederson in November 2024. The company manufactures lithium-ion battery cells.Operating
Borman Specialty MaterialsBorman Specialty Materials’ Henderson facility manufactures electrolytic and specialty chemical products used for energy storage systems.Operating

RELEVANT STATE NEWS

STATE CLIMATE DISASTERS