Michigan State Profile

Last Updated: 9/15/26 — Updated Monthly

STATE OF PLAY

As of July 2026, Michigan ranked 15th in the nation for clean energy deployment, with over 13 GW of operating clean energy capacity and 4.3 GW of additional capacity planned. Michigan’s clean energy industry employs over 127,000 workers, an increase of over 13% since 2020. Michigan is also home to 84 planned or operating data centers, and the state’s utilities have projected that data centers would account for up to 70% of growth demand. Despite Michigan’s strong clean energy economy, Trump and Republicans have threatened over 7,600 clean energy jobs, threatened the loss of 4.4 GW of new energy generation needed to meet rising demand, and led to energy costs increasing by 24%.

KEY 2026 RACES
MI-GOVMI-SENMI-04MI-07MI-10

ENERGY BREAKDOWN

CLEAN ENERGY PROJECTS & JOBS

Clean Energy Projects Announced Since IRA Passage
Project SummaryProjected Jobs InvestmentProject Status
AGS Automotive Systems Manufacturing ExpansionIn April 2023, AGS Automotive Systems announced plans to invest $20 million to expand operations at its Sterling Heights vehicle electrification facility. 120$20 millionOperational
Armstrong International Heat Pump Manufacturing Capacity ExpansionIn November 2023, Armstrong International received a $5 million IRA grant to increase heat pump manufacturing at its Three Rivers facility. ––Under Construction
ATC Drivetrain Remanufacturing FacilityIn December 2023, ATC Drivetrain announced plans to invest $7.9 million to open a battery and electric drive unit remanufacturing facility in Holland. 163$7.9 millionAnnounced
Benteler Battery PlantIn September 2024, Benteler Automotive received final approval to open an assembly facility in Wyoming. The facility will produce battery components for the Ford Transit van.170$105 millionAnnounced
BlueOval Battery Park MichiganIn February 2023, Ford announced it would open an LFP battery plant in Marshall. Ford planned to invest $2 billion in the BlueOval Battery Park, the first automaker-backed plant of its kind in the U.S. 1,700$2 billionUnder Construction
Cabot Conductive Additives PlantIn September 2024, Cabot Corporation received a $50 million BIL-funded grant from the DOE to open a manufacturing plant for EV battery-grade carbon nanotubes and conductive additives in Van Buren Township. 335–Announced
CE Clean EnergyIn January 2025, Consumers Energy was selected to receive a $5.23 billion conditional loan commitment from the DOE Loan Programs Office to upgrade its energy infrastructure in Michigan. CE Clean Energy would invest in solar and wind generation, battery storage, virtual power plant projects, and replace legacy natural gas pipelines. The loan was authorized through the Energy Infrastructure Reinvestment program, which was established by the IRA. –$5.23 millionAnnounced
Concept Metals EV Components FacilityIn March 2023, Concept Metals Group announced it would open a new facility in Spring Lake to produce battery tray components for GM EVs. Concept Metals said the investment expanded its ability to support the growing EV market. 25$15.5 millionAnnounced
Copperwood MineIn March 2024, Highland Copper passed a key funding hurdle for its Copperwood Mine in Gogebic County. The mine will increase the domestic copper supply, a key input for the clean energy transition. Highland Copper invested $425 million in the mine, which is projected to provide over $15 million per year in local, county, and state tax revenue and increase business spending in Michigan by over $130 million per year. 380$425 millionPassed Funding Hurdle
Corning Solar Component Manufacturing FacilityIn February 2024, Corning announced plans for a solar component manufacturing facility that would see a capital investment of up to $900 million in Saginaw County. Corning planned to build the facility in Richland Township. Corning expected to receive tax credits from the IRA and CHIPS and Science Act for the facility. In April 2025, Corning announced it planned to increase its total investment to $1.5 billion. 1,500$1.5 billionUnder Construction
DEKRA Automotive Test Center of ExcellenceIn June 2024, DEKRA announced it would open an Automotive Test Center of Excellence in Plymouth. The facility will test electromagnetic compatibility for EV components, EV batteries, and EV chargers. 18$22.8 millionAnnounced
DESign Manufacturing Operations FacilityIn June 2023, DESign announced plans to establish its U.S. headquarters and manufacturing operations in New Hudson. The project will manufacture assembly equipment for Ford and Lincoln EVs. 45$19 millionOperational
Detroit Diesel EV Battery Prototyping and Pack Assembly FacilityIn December 2024, Detroit Diesel announced plans to expand its Redford Township factory to manufacture electric components for medium- and heavy-duty trucks. 436$285 millionAnnounced
DTE ClearVIsion PlanIn November 2022, DTE announced its ClearVision plan to increase renewable energy generation and support grid reliability. Additionally, DTE Energy indicated it could pass over $500 million in savings to consumers because of tax credits in the IRA.–$9 billionAnnounced
DTE Electric Renewables DeploymentIn January 2025, DTE Electric was selected to receive a $7.17 billion conditional loan commitment from the DOE’s Loan Programs Office. If finalized, the loan would support DTE Electric’s efforts to expand its renewable energy and battery storage capacity in Michigan. The loan was offered under the Energy Infrastructure Reinvestment program, which was established by the IRA. –$7.17 billionAnnounced
Eaton Corp. Michigan ExpansionIn June 2023, Eaton Corp. announced it would expand its power management operations in Marshall, Southfield, and Canton Township. 100$20 millionAnnounced
EAVX EV Component Manufacturing Facility ExpansionIn November 2022, JB Poindexter & Co. announced its technology subsidiary EAVX would expand its manufacturing facility for alternative energy power chassis and advanced EV prototypes in Ypsilanti Township. 75$3.79 millionAnnounced
EcoG U.S. HeadquartersIn January 2024, EcoG, an EV charging company, announced it would open its U.S. headquarters in Detroit. 45$14.4 millionOperational
Envergia Battery Recycling and Mineral Recovery FactoryIn January 2025, Envergia announced plans to open its first battery recycling and critical mineral recovery facility in Detroit. The facility would recycle batteries and capture critical minerals from used batteries to support the EV supply chain. 52$32 millionAnnounced
Expleo Research and Development FacilityIn June 2023, Expleo USA announced it would open a new research and development facility in Oakland County to support new e-mobility and green mobility partnerships with automotive businesses. 196$2 millionOperational
Future Technologies ExpansionIn December 2023, Future Technologies Inc. announced that it would expand its Bay City facility. The company designs EV battery trays and powertrain systems for automotive companies. The Michigan Economic Development Corporation said Future Technologies’ $1 million investment supported updated equipment for green transportation and would help solidify the state’s leadership in vehicle electrification. 10$1 millionAnnounced
General Motors High Speed Fuel Cell Stack Manufacturing ExpansionIn March 2024, General Motors received a $30 million grant from the DOE to expand its hydrogen fuel cell manufacturing capability. The grant, which was funded by the BIL, increased manufacturing capacity by 200,000 cells per year in Brownstown.200–Announced
Gestamp Facility RenovationsIn July 2024, Gestamp announced that it would invest $390 million in its Michigan manufacturing facilities. $325.5 million of that investment would be used to renovate and expand plants in Chelsea, Mason, and Lapeer to add production machinery and equipment for EV manufacturing. 190$325.5 millionAnnounced
Gestamp Steel Blanks Assembly FacilityIn February 2024, Gestamp planned to build a new plant to weld steel blanks to make assemblies for vehicles in Macomb County. The steel blanks would supply GM’s Orion Assembly facility, which manufactures the automaker’s EVs. 390$42.5 millionAnnounced
GM EV Parts WarehouseIn July 2023, GM announced plans to open a new EV parts warehouse at a former American Motors Corporation site in Detroit. 350–Announced
Hemlock Semiconductor Manufacturing Facility ExpansionIn September 2022, Hemlock Semiconductor announced it would expand its Thomas Township campus, which will support silicon manufacturing for both semiconductors and solar. In October 2024, the company was selected to receive up to $325 million in funding from the CHIPS and Science Act to support the facility. The grant was finalized on January 7, 2025. 1,170$375 millionUnder Construction
Jing-Jin Electric North America Manufacturing ExpansionIn February 2024, Jing-Jin Electric North America announced a $16.5 million investment to expand EV component manufacturing at its Farmington Hills facility. 100$16.5 millionAnnounced
Laepple Automotive Metal Stamping PlantIn September 2024, Laepple Automotive announced it would redevelop a former Stellantis facility as a metal stamping plant in Detroit. Laepple Automotive invested in the U.S. after winning a “major order” from a U.S. EV manufacturer. 173$93.4 millionAnnounced
Lear EV GigafactoryIn October 2022, Lear announced plans to open a $112.5 million battery plant in Independence Township to build battery connector units for GM EVs. 500$112.5 millionAnnounced
Lear Traverse City Plant ExpansionIn December 2022, Lear Corporation announced a $28 million expansion of its Traverse City manufacturing facility to increase manufacturing capacity for battery pack components. Lear will manufacture battery disconnect units and other battery subsystems for GM’s Ultium EVs at the plant. 79$28 millionAnnounced
LG Energy Solutions Lansing Battery PlantLG Energy Solution invested $2.6 billion to open a battery manufacturing plant in Lansing under the Ultium Cells brand. The plant, initially a joint venture with General Motors, was supported by a $2.5 billion loan from the DOE’s Loan Programs Office, which was funded in part by the IRA. After GM sold its stake in the facility in December 2024, Toyota announced it would transfer a $1.5 billion battery order to the Lansing manufacturing facility. 3,200$2.6 billionHiring
LHP Engineering EV Testing and Training CenterIn May 2024, LHP Engineering Solutions announced it would renovate a facility in Pontiac to house its EV test labs. 35$3.6 millionAnnounced
LT Precision Manufacturing And Corporate OfficeIn March 2024, LT Precision announced a $43.2 million investment to open its U.S. corporate headquarters and manufacturing center in Holland. The new facility was expected to manufacture battery cooling plates for U.S. EVs. 70$43.2 millionAnnounced
Lucid Motors Southfield Engineering And R&D HubIn February 2024, Lucid Motors announced plans for an EV engineering and R&D hub in Southfield. 262$10 millionOperational
LuxWall Factory 1In July 2023, LuxWall announced it would open a manufacturing facility in Litchfield. The facility would manufacture LuxWall’s energy-efficient, vacuum-insulating glass that boosts heat retention by 45% and cooling retention by 60%. 111–Operational
LuxWall Factory 2In November 2023, LuxWall received a BIL-funded grant from the DOE to construct a manufacturing facility in Detroit. The manufacturing facility will be located on the site of a former coal plant in Detroit’s Delray neighborhood. LuxWall manufactured energy-efficient, vacuum-insulating glass that boosts heat retention by 45% and cooling retention by 60%. 277–Announced
Magna Auburn Hills EV Seating PlantIn March 2023, Magna announced plans to build a new plant in Auburn Hills to supply seats for General Motors’ EVs. 500$100 millionUnder Construction
Magna EV Structures ExpansionIn October 2022, Magna announced it would invest $426 million to expand its existing vehicle structures facility in St. Clair. The expanded facility will supply battery enclosures for the Chevrolet Silverado EV. 920$426 millionAnnounced
Magna New Mobility R&D FacilityIn May 2024, Magna New Mobility and Magna Steyr announced they would establish a new research and development facility in Troy. The new $1.2 million facility included manufacturing, laboratory, and office space for the company’s advanced research facilities. 100$1.2 millionAnnounced
Magna Powertrain FacilityIn October 2022, Magna announced it would open a new powertrain facility in Shelby Township. The facility was expected to supply battery tray components for EVs. 155$96.2 millionHiring
Mersen Bay City Manufacturing Facility ExpansionIn June 2023, Mersen announced a $71 million investment to expand its Bay City manufacturing facility. Mersen’s Bay City facility manufactures silicon carbide-coated graphite components, which are necessary for new electrification and EV technologies. Mersen’s expansion was driven by increased demand for its graphite for EV chips. 70$71 millionAnnounced
Mersen Greenville Manufacturing Facility ExpansionIn June 2023, Mersen announced a $10 million investment to expand its Greenville manufacturing facility. Mersen’s Greenville facility specializes in machining graphite and rigid carbon insulation for electrification and EV technologies. 45$10 millionAnnounced
Mitra Chem Battery Material Manufacturing FacilityIn September 2024, Mitra Chem received a $125 million BIL-funded grant from the DOE to establish a battery material manufacturing facility in Muskegon. Mitra Chem partnered with Sun Chemical for the facility, which manufactures lithium-ion phosphate cathodes. Mitra Chem said the facility would be the first in the U.S. to manufacture these cathodes and, in line with the goals of the IRA, would reduce dependence on other nations for key battery inputs. 150–Announced
Muskegon County Resource Recovery Center Solar FacilityIn March 2024, Consumers Energy and the Muskegon County Resource Recovery Center announced a partnership to develop a 250 MW solar facility, enough to power 40,000 homes. The solar facility will be co-located with a wastewater treatment and farm facility. ––Under Construction
NanoGraf Manufacturing FacilityIn September 2024, NanoGraf announced that it would open a battery manufacturing facility in Flint. The facility will produce enough silicon anode material for over 1.5 million batteries per year once it opens in 2027. The project was supported by a $60 million BIL-funded grant.  350–Announced
Navico Battery Center of ExcellenceIn December 2023, Navico announced plans to invest $32.7 million to establish a Center of Excellence for battery research and manufacturing in Lowell. 80$32.7 millionAnnounced
Piston Automotive EV Assembly and Supply FacilityIn February 2024, GM announced that it had contracted Piston Motors to operate a parts plant for its electric pickup trucks in Auburn Hills.960$278 millionAnnounced
Polar Racking Michigan ExpansionIn May 2023, Polar Racking announced it would add a new solar mounting manufacturing facility in Michigan. Polar Racking said the expansion was needed to meet growing customer demand for solar mounts that met IRA domestic content requirements. 10–Operational
Revex Technologies Battery Manufacturing FacilitiesIn 2024, Revex Technologies received a $145 million grant funded by the BIL to increase the recovery of nickel and other key metals for EV batteries. Revex partnered with Eagle Mine, the only U.S. nickel mine, to turn battery waste into critical minerals across three facilities in Marquette County. 475$253 millionAnnounced
Robert Bosch Regional Hydrogen Research and Development HubIn January 2025, Bosch announced plans to open a regional hydrogen research and development hub at its Farmington Hills headquarters. 28$13.7 millionAnnounced
Scout Motors Product Design and Engineering FacilityIn December 2023, Scout Motors announced it would invest $11 million to establish a research and development facility for electric trucks in Novi. 200$11 millionAnnounced
Shyft Group EV Manufacturing Expansion – MichiganThe Shyft Group announced a $16 million expansion to existing facilities in Charlotte to manufacture commercial EVs and boost production to 3,000 EVs per year.680$16 millionAnnounced
SK Siltron CSS Facility ExpansionIn February 2024, SK Siltron received a $544 million loan from the DOE’s Loan Programs Office to expand silicon carbide wafer manufacturing in Bay City. 400$544 millionAnnounced
Stellantis & DTE Agreement On Expanded Solar Power For Auto ManufacturingIn December 2022, Stellantis announced a new partnership with DTE Energy to generate enough solar energy in Michigan to power 70 of Stellantis’s facilities in the state. 15–Announced
Sunfish Solar 2 FacilityIn September 2023, Consumer Energy Company received approval to acquire the planned Sunfish Solar 2 facility in Calhoun County. Sunfish Solar 2 was expected to generate enough power for over 183,500 Michigan homes and would avoid 1.5 million tons of carbon dioxide emissions per year.350$453 millionAnnounced
Toyota and LG Energy Solutions Battery Manufacturing PlantIn October 2023, LG Energy Solution (LGES) and Toyota signed a supply agreement in which LGES would provide Toyota with lithium-ion batteries for U.S.-manufactured EVs. As part of the agreement, the two companies would invest $3 billion to expand LGES’s Holland battery manufacturing plant to produce the batteries. Energy Secretary Granholm visited the plant in March 2024 and said it was a key part of America’s clean energy future. –$3 billionAnnounced
Toyota EV Battery Testing LabIn June 2023, Toyota announced it would invest $50 million to build a new EV battery laboratory in York Township. The new lab space at Toyota’s North American headquarters will confirm the performance of the company’s EV batteries. –$47 millionAnnounced
Treau Inc. Heatpump FactoryIn November 2023, Treau received a $17.5 million DOE grant, funded by the IRA, to increase heat pump manufacturing at its Oakland County facility, which was in a Justice40 community. 300–Announced
UL Solutions North America Advanced Battery LaboratoryIn December 2022, UL Solutions announced plans for the North American Advanced Battery Laboratory in Auburn Hills. The new facility, which will be one of the most extensive battery testing and engineering labs in North America, will support the EV and industrial battery markets. 61$72.7 millionUnder Construction
Vesper Energy Otsego County Battery Energy Storage SystemIn February 2025, Vesper Energy shared plans to build a battery energy storage system near Gaylord. The storage facility would help the community avoid power blackouts and create hundreds of construction jobs. Vesper planned to sign a community benefits agreement for the project. ––Announced
Via Motors Technical CenterIn October 2022, Via Motors announced it would invest $12.4 million to move its headquarters and technical center to Auburn Hills. 300$12.4 millionOperational
Voyager Battery StorageIn November 2024, Voyager Energy Storage was approved by the Michigan Public Service Commission. The 100 megawatt battery energy storage system was located in Saline Township, Michigan. The storage system was expected to generate $1.3 million in tax revenue for the township, $2.8 million in tax revenue for the county, and $6.2 million in tax revenue for the local school district over its lifetime. Voyager Energy Storage was expected to go online in 2027.––Announced
Weller Truck Parts EV Components Manufacturing FacilityIn March 2024, Weller Truck Parts announced it had renovated its Byron Township factory to add remanufacturing space for EV components. 130$13 millionOperational

Additional projects threatened or canceled in the state due to threats to clean energy:

Additional Threatened Or Canceled Clean Energy Projects
Project SummaryProjected Jobs InvestmentProject Status
Akasol Ended EV Battery Manufacturing In MichiganIn February 2025, Akasol, an EV battery manufacturer, announced it would end production in Michigan in April 2025. As a result, the company planned to lay off 188 workers at facilities in Warren, Michigan, and Hazel Park. Although Akasol planned to continue battery manufacturing at its plant in Seneca, South Carolina, the company did not disclose if it would offer its laid off Michigan workers jobs at the South Carolina facility.188–Canceled
Lear Canceled EV Battery Parts FacilityIn June 2025, Lear Corporation reportedly canceled plans to build a battery parts manufacturing facility to supply GM’s Orion manufacturing facility in Independence Township. The cancellation was linked to GM’s decision to pull back its EV investments and increase manufacturing of gas-powered vehicles.500$80 millionCanceled
ZF Canceled Plans To Retrofit Michigan Factory For EV ManufacturingIn December 2024, ZF announced it would no longer retrofit its Marysville manufacturing plant to produce EV parts. ZF had received a $157.7 million federal grant to support the facility’s retrofit, which was funded by the IRA. The grant was expected to allow the facility to retain 536 jobs. The company said the decision was due to e-mobility demand moving slower than anticipated.–$157.7 millionCanceled
Nel Delayed Development Of Electrolyzer Manufacturing FacilityIn February 2025, Nel Hydrogen announced an indefinite delay of its planned electrolyzer manufacturing facility in Plymouth. In March 2024, Nel announced that it had received a $50 million award from the DOE, funded by the BIL, to support domestic electrolyzer manufacturing. Nel said delays in government incentives were a reason for the delay. Nel Hydrogen cited uncertainty surrounding the implementation and preservation of the IRA’s tax credits for qualified clean hydrogen production as a reason for the delay, noting that the incentive was critical to its clients and influenced the company’s investment decisions and project timeline.500$400 millionDelayed
GM Laid Off 200 Workers At Its Factory Zero Detroit-Hamtramck Assembly CenterIn April 2025, General Motors announced it was cutting 200 jobs at its Factory Zero Detroit-Hamtramck Assembly Center, where the company manufactures EVs. The cuts at the plant were attributed to lower-than-expected EV sales because of consumer concerns, which have been heightened by the Trump administration’s cuts to federal funding for EV infrastructure, EV tax credits, and tariffs that are increasing the prices of all vehicles.200–Layoffs
GM Canceled Plans To Open A Hydrogen Fuel Cell Production Facility In Detroit, MichiganIn October 2025, General Motors officially canceled plans to open a hydrogen fuel cell manufacturing facility in Detroit after pausing plans to open the facility in May 2025. The company planned to invest $55 million in the facility, but canceled the facility after determining that there was no path forward for hydrogen propulsion. 312–Canceled
Fortescue Canceled Its Planned Detroit, Michigan, Battery Manufacturing FacilityIn September 2025, Fortescue canceled plans to open an EV battery plant in Detroit. The company blamed “current policy settings and market conditions” in the U.S., including the loss of “critical tax credits” and the Republican “clampdown on clean energy credits.”  600$210 millionCanceled
GM Laid Off An Additional 280 Workers At Factory Zero Detroit Hamtramck EV PlantIn August 2025, GM announced it was temporarily laying off 360 workers at its Factory Zero Detroit-Hamtramck Assembly Center. The month-long layoffs were related to the production of two EVs: the GMC Hummer EV and the Cadillac Escalade IQ. The layoffs were expected to run until October 6, 2025, and allow GM to align production with vehicle inventory needs. In October 2025, GM confirmed that 280 employees would remain laid off until the end of 2025.280–Layoffs
Natron Energy Closed Its Holland, Michigan, Manufacturing FacilityIn September 2025, Natron Energy announced it was shutting down. As a result, 37 employees at the company’s Holland plant would be permanently laid off. Natron manufactured sodium-ion batteries.37–Layoffs
Gotion Battery Plant CanceledIn October 2025, Gotion’s planned battery manufacturing facility in Big Rapids was canceled. The facility, expected to be supported by a $2.4 billion investment, would have produced battery anode and cathode material. 2,350$2.4 billionCanceled
TS Conductor Corporation High Voltage Direct Current Conductor Manufacturing Expansion Grant CanceledIn October 2025, TS Conductor Corporation’s grant to support the construction of a dedicated manufacturing line for its high-voltage direct current carbon core conductors was canceled. The $28.2 million grant, combined with $33.6 million in non-federal funding, would help meet growing demand for the conductors, which are used in transmission lines. The new manufacturing facility was expected to be located in Erie Township.587$61.8 millionGrant Cancellation
Armstrong International Heat Pump Manufacturing Facility Grant CanceledIn October 2025, Armstrong International’s grant to support the construction of a new heat pump manufacturing line was canceled. The $5.1 million grant, combined with $5.1 million in non-federal funding, was expected to support the development of a new manufacturing line in Three Rivers with the capacity to produce at least 150 industrial water-sourced heat pumps per year. 62$10.2 millionGrant Cancellation
LuxWall Glass-Based Insulation Manufacturing Grant CanceledIn October 2025, LuxWall’s grant to support the construction of a new glass-based insulation manufacturing facility was canceled. The $31.8 million grant, combined with $49.7 million in non-federal funding, was expected to help minimize energy loss in the built environment and bolster energy efficiency in buildings. The manufacturing facility was expected to be located in the Delray neighborhood of Detroit.277$81.5 millionGrant Cancellation
Ricardo LLC Advanced EV Inverter, On-Board Charger, And Auxiliary DC Converter Grant CanceledIn October 2025, Ricardo LLC’s grant to support the development of a 3-in-1 inverter, on-board charger, and auxiliary DC converter for EV vehicles was canceled. The $5 million grant, combined with $1.3 million in non-federal funding, had a place of performance in Belleville.–$6.3 millionGrant Cancellation
RG Resource Integrated Solar Panel And Thermal Capture Manufacturing Grant CanceledIn October 2025, RG Resource’s grant to support the development of a manufacturing facility for the company’s integrated solar photovoltaic and thermal capture panels was canceled. The $5.1 million grant, combined with $6.5 million in non-federal funding, was expected to support a 120,000 units-per-year manufacturing facility. The manufacturing facility, announced through PowerPanel, was expected to be located in Lansing.150$11.6 millionGrant Cancellation
General Motors Electric Vehicle Manufacturing Conversion Grant CanceledIn October 2025, General Motors’ grant to support the conversion of its Grand River plant to EV assembly was canceled. The $500 million grant was combined with $900.6 million in non-federal funding.50$1.4 millionGrant Cancellation
GM Laid Off Additional Workers At Factory ZeroIn October 2025, General Motors announced it would cut an additional 1,200 jobs at its Factory Zero EV manufacturing facility. GM attributed the cuts to “slower near-term EV adoption and an evolving regulatory environment.” GM also plans to close the factory completely until November 24, 2025. The impacted workers were laid off in January 2026.1,200–Layoffs
Avancez Laid Off 143 Workers At Plant That Supplied GM’s Factory ZeroIn November 2025, Avancez announced it would terminate 143 workers at its Hazel Park plant, which supplied GM’s Factory Zero. The terminations were linked to GM’s decision to cancel a shift at Factory Zero, which GM had attributed to “slower near-term EV adoption and an evolving regulatory environment.” The Avancez facility produced EV components that were used in EV manufacturing at Factory Zero.143–Layoffs
Bollinger Motors Permanently ClosedIn November 2025, Bollinger Motors, an electric truck manufacturer, permanently closed down. The company had struggled to meet payroll during the fall before deciding to cease operations.––Layoffs
Our Next Energy Laid Off Staff In NoviIn January 2026, Our Next Energy laid off 29 employees in Novi. The company attributed the closures to an unexpected cancellation of a contract with its largest EV customer. The day after the layoffs, Our Next Energy announced it was suspending its EV battery investments to focus on batteries for utility-scale energy storage, rail, and defense uses.29–Layoffs
Samsung SDI Laid Off Staff At Automotive Battery HeadquartersIn January 2025, Samsung SDI announced it would lay off 179 workers at its Auburn Hills automotive battery headquarters despite investing more than $100 million in the facility in recent years. The majority of impacted jobs are plant operators. A Samsung SDI spokesperson did not provide the rationale for the layoff, but the press linked it to slower-than-expected EV demand.179–Layoffs
Plastic Omnium Canceled Plans To Open A Hydrogen Storage Container Manufacturing FacilityIn May 2025, Plastic Omnium reportedly canceled plans to open a hydrogen storage container manufacturing facility in Grand Blanc Township, Michigan. The planned $171 million investment was expected to create 175 manufacturing jobs.175$171 millionCanceled
Montcalm Wind Project CanceledIn March 2026, Apex Clean Energy canceled plans for the Montcalm Wind Project in Montcalm County, Michigan, after falling short on leasing agreements with area landowners. Many landowners supported the project because the turbines would bring in additional revenue, but others were concerned about property setbacks, turbine noise, and the proposed turbine heights. If completed, Montcalm Wind was expected to generate 375 megawatts of energy, enough to power 90,000 homes. The project was also expected to support hundreds of jobs during construction and create 15 full-time jobs.15–Canceled
Navitas Systems Laid Off Staff In Ann ArborIn May 2026, Navitas Systems filed a WARN notice informing the state of Michigan that it plans to lay off 82 employees. The company will also close one or two of its facilities in Ann Arbor, Michigan. A spokesperson for East Penn Manufacturing Co., which owns Navitas Systems, said the changes were part of the company’s reorientation of the “lithium side of the business.” Navitas manufactures lithium-ion batteries.82–Layoffs
SK Siltron CSS Closed Its Bay County Manufacturing FacilityIn July 2026, SK Siltron announced it was winding down the SK Siltron CSS subsidiary and closing its Bay City, Michigan plant, citing “significant shifts in the electric vehicle market.” This shift in the electric vehicle market likely refers to Trump’s cancellation of the $7,500 EV Tax Credit. A company spokesperson confirmed that the wind-down would affect all 140 employees, and that “most employees would be terminated in about 60 days.” The company manufactured silicon carbide wafers for electric vehicles. SK Siltron received a $544 million loan from the U.S. Department of Energy’s Loan Programs Office to expand manufacturing, but the company said it paid off the loan earlier in July.140$544 millionLayoffs

Other projects in the state, started before the Inflation Reduction Act:

Project or Company NameProject DetailsProject Status
Amphenol Amphenol’s Fraser facility manufactures components for solar systems. Operating
Henkel US Operations CorporationHenkel’s Warren plant supplies Bonderite® brand metal cleaning and surface treatment chemistries. The plant employs over 80 employees and has been open for over 24 years. Operating
General MotorsIn June 2022, GM announced that it would invest $81 million into its Warren facility to build EVs. The facility opened in 1956 and has more than 21,000 employees. Announced
Huntsman Huntsman’s East Lansing production facility is a supplier of synthetic and formulated polymer systems that are used in wind and solar operations. Operating
Applegate InsulationApplegate Insulation is based in Webberville. The plant was built in 1995 and the company is the world’s largest family-owned cellulose insulation manufacturer. Operating
Blue ArcThe Shyft Group launched Blue Arc EV solutions in March 2022 at its Charlotte facility. Announced
Nu-Wool Company Inc.Nu-Wool Company’s Jenison facility manufactures cellulose insulation. Operating
Harbor FoamHarbor Foam’s Grandville facility manufactures insulation products.Operating
Michigan Foam ProductsMichigan Foam Products’ Wyoming facility manufactures expanded polystyrene. Operating
Atlas Molded ProductsAtlas Molded Products’ Byron Center facility manufactures expanded polystyrene.Operating
Bradford White CorporationBradford White’s Middleville facility manufactures heat pumps and water heaters. Operating
Imerys Performance MineralsImerys’ Vicksburg facility manufactures perlite, lithium, and other minerals.  Operating
Monoglass Inc.Monoglass’s Albion facility manufactures spray glass fiber insulation. Operating
Heat Controller Inc.Heat Controller’s Jackson facility manufactures HVAC equipment. Operating
Xalt Energy MI LLCXalt Energy’s Midland facility manufactures battery and fuel cell systems for commercial transportation.Operating
Volta Power SystemsVolta Power Systems’ Holland facility manufactured battery energy systems. In October 2025, the company was acquired by investors and renamed Voltagen.Operating
Erwin QuarderErwin Quarder’s Grand Rapids facility manufactures components for electric vehicles. In October 2025, the company announced it was expanding its U.S. manufacturing footprint from 82,500 to 130,000 square feet. Expanding
BASF Toda America LLCBASF’s Battle Creek facility manufactures materials used in lithium-ion batteries that power electric vehicles. The facility has 47 employees. Operating
Camel Energy Manufacturing MichiganCamel Energy’s Battle Creek facility opened in 2022 and was expected to produce two million advanced automotive batteries annually.  Operating
KautexKautex’s Troy facility manufactures EV components. Operating
Ascend ElementsAscend Elements’ Novi facility manufactures battery materials. Operating
Navitas SystemsNavitas Systems’ Ann Arbor facility manufactures batteries and energy storage systems. Operating
Zakuro, Inc.Zakuro’s Ann Arbor facility manufactures energy storage systems. Operating
Paraclete Energy, Inc.Paraclete Energy’s Chelsea facility manufactures anode battery grade materials.Operating
Dow SiliconesDow’s Midland and Auburn facilities manufacture components for solar energy systems.Operating
SolarBOSTerrasmart’s SolarBOS facility in Grand Rapids manufactures components for solar energy systems. The company said it was “Well-positioned to support the IRA’s domestic content program.” Operating
WorthenWorthen’s Grand Rapids facility manufactures components used in solar energy systems.Operating
Cascade EngineeringCascade Engineering’s Grand Rapids facility manufactures racking components used for solar energy systems. Operating
The Solar RaqThe Solar Raq’s Pontiac facility manufactures kits for rooftop solar installations.Operating
Game Changer SolarGame Changer Solar’s Detroit facility manufactures solar trackers and mounting equipment.Operating
Motiv SystemsMotiv Systems’, now merged with Workhorse, Novi facility manufactures commercial EV trucks. Operating
Roush IndustriesRoush Industries’ Livonia facility manufactures electric trucks. In June 2025, Kodiak selected Roush to manufacture autonomous trucks. Operating
Kaydon BearingsKaydon Bearings’ Norton Shores facility manufactures bearings used for onshore wind systems.Operating
BorgWarnerBorgWarner’s Auburn Hills and Dearborn facilities manufacture EV charging systems and other components for electric vehicles. Operating
FLOFLO’s Auburn Hills facility manufactures EV charging systems.Operating
VentowerVentower’s Monroe facility manufactures offshore wind turbine towers.Operating