Last Updated: 9/15/26 — Updated Monthly

STATE OF PLAY 

As of July 2026, Iowa ranked 12th in the nation for clean energy deployment, with over 14 GW of operating clean energy capacity, and ranked as the second-largest wind power producer in the U.S. in 2024. The clean energy industry employs over 33,000 workers in the state, an increase of over 16% since 2020. Iowa is also home to 130 planned or operating data centers, one of the largest concentrations in the Midwest, and data centers accounted for nearly 12% of the state’s total electricity consumption in 2023. Despite Iowa’s strong clean energy economy, Trump and Republicans have threatened the loss of 7.4 GW of new energy generation needed to meet rising demand and their policies have led to energy costs increasing by 33%.

Key 2026 Races
IA-GOVIA-SENIA-01IA-02IA-03

ENERGY BREAKDOWN

CLEAN ENERGY PROJECTS & JOBS

Clean Energy Projects Announced Since IRA Passage
Project SummaryProjected Jobs InvestmentProject Status
Nordex Group Nacelle Manufacturing FacilityIn July 2024, the Nordex Group announced it would restart production at its West Branch manufacturing facility. The facility will produce nacelles and other wind turbine components specifically designed to meet the IRA’s domestic input and manufacturing requirements and qualify for the law’s tax credits. 100–Announced
Siemens Gamesa Fort Madison Wind Turbine ProductionIn December 2022, Siemens Gamesa reopened a previously closed wind turbine manufacturing plant in Fort Madison. The President and CEO of the Lee County Economic Development Group said reopening the plant was made possible, in part, by the IRA.250–Operational
TPI Composites Wind Turbine Manufacturing PlantIn November 2022, TPI Composites announced it would reopen its Iowa wind turbine blade manufacturing plant. The plant closed in 2021 due to uncertainty over wind energy tax credits. Following tax credit certainty provided by the IRA, the factory is expected to reopen in the second quarter of 2025 and fully restore its 750-person workforce.750–Announced
Regen Wind Turbine Recycling FacilityIn June 2024, Regen Fiber opened a wind turbine blade recycling facility in Fairfax. The facility can process more than 30,000 tons of blades per year. The recycled materials are used to increase the durability of concrete and asphalt.––Operational
Generation Repair and Service Facility ExpansionIn November 2024, Generation Repair and Service announced plans to expand its wind turbine facility in Story City. Generation Repair and Service invested $17 million in the expansion and received $481,500 in Iowa Economic Development Authority-approved tax benefits. 2$17 millionAnnounced
Alliant Energy Wind Generation ExpansionIn July 2025, Alliant Energy announced plans to add up to 1,000 megawatts of wind generation in Iowa. The $3 billion investment was expected to support the construction of over 350 wind turbines, which could provide enough power for over 350,000 homes. Alliant planned to complete the project by 2030.–$3 billionAnnounced
Rock Creek Energy CenterIn August 2025, NextEra Energy broke ground on the Rock Creek Energy Center in Clinton County, Iowa. The solar farm was expected to generate up to 150 megawatts of solar energy, enough to power 30,000 homes. NextEra invested $320 million in the project, which was expected to generate at least $11 million in local tax revenue. The Rock Creek Energy Center was expected to be operational as early as December 2026.300$320 millionAnnounced

Other projects in the state, started before the Inflation Reduction Act:

Project or Company NameProject DetailsProject Status
SEA Electric EV AssemblySEA Electric’s Grimes, Iowa, production facility has been operating since 2019 and employs over 25 people. Operating
Arcosa Onshore Wind Towers Manufacturing FacilityArcosa’s Newton, Iowa, wind tower manufacturing facility began operations in 2008 and is one of the company’s largest capacity plants. The facility employs 125 people. Operating
Clipper Wind Hub AssemblyClipper Wind has been operating in Cedar Rapids, Iowa, since 2006 and employs between 500-1000 people. The facility provides refurbishment services and maintains a line of wind turbine service parts. Operating
NSK Clarinda PlantNSK’s Clarinda, Iowa, ball bearing manufacturing plant opened in 1975 and has expanded operations 16 times. It employs 175 people. Operating
Atlas Molded Products Manufacturing FacilityAtlas’ Washington, Iowa facility employs 100 people, and is a polystyrene company that makes foam products for architectural functions, protective and cold chain packaging, and several other uses. Operating
Mason City Recycling CenterMason City Recycling Center has operated out of a 50,000+ sq ft facility in Mason City, Iowa since 1979. The company manufactures low dust Comfort Zone Cellulose. Operating
Gomaco Manufacturing FacilityGomaco’s corporate headquarters and manufacturing facilities are located in Ida Grove, Iowa. The company employs around 350 local individuals and celebrated its 50th anniversary in 2015. Operating
Lennox International Manufacturing and Office FacilityLennox’s Marshalltown, Iowa, facility has over one million sq ft of manufacturing and office space. The company has been operating in Marshalltown since 1904, and as of 2018, had around 1,400 employees. Operating

RELEVANT STATE NEWS

STATE CLIMATE DISASTERS